Project Overview
In July 2018, KPI reported overseeing a six-color HyCorr rotary die cutter, American Baler, and Mosca strapping machine installation in Indianapolis. The account describes engineering and contractor coordination.
The documented 2018 installation brought converting, baling, and strapping equipment into one plant project. KPI worked with HyCorr, Mosca, and Wheeler Technologies representatives. Its published account also describes a new electrical service and switchgear for the machinery.
Project Objectives
The published project account emphasizes communication between the customer, subcontractors, and KPI. A shared online Gantt chart kept the teams informed as the installation progressed. The equipment also required an increase in the plant’s electrical capacity.
Key Features
For a similar corrugated equipment installation, share the machine list, layout, proposed positions, and production requirements. Identify access routes, utility information, contractor responsibilities, and shutdown constraints for review. KPI can discuss the proposed scope with your team. This 2018 record describes historical work; a new project needs its own scope and schedule.
What This Project Means For Your Team
Use this historical example to frame a new conversation about your plant. Share the equipment, location, access requirements, and production timing so KPI can review the installation scope.
Project Record
Detail
Project Resources
Discuss equipment, access, utilities, and timing with KPI before agreeing the work.